Completed Projects
L & T Constructions / Bangalore International Airport
PNC Infratech / Chitradurga-Davanagere 6 Lane Highway
Ashoka Buildcon Ltd / Tumkur-Shimoga Highway
PNC Infratech Ltd / Challakere - Hiriyur Highway
Ajim Prem Ji University / Software Park at Sarjapur Road, Bangalore
Biocon Ltd / Industrial Building at Hebbagodi, Bangalore
IRB Infrastructure Ltd / Tumkur - Chitradurga Section NH48 (Old NH4)
MKC Infrastructure Ltd / TK-DVG Railway Project, Chitradurga
Ashoka Buildcon Ltd / Srinivaspur - Mulbagal Highway Project
R & C Infra Engineers Pvt Ltd / Hubli - Dharwad Highway
Shobha Ltd / HRC Pristine
Skyline Group / Residential Building Project, Bangalore
RMZ Group / Software Park at Bellandur, Bangalore
Larsen & Toubro / NH13 Highway Hospet - Chitradurga
Shobha Ltd / HRC Pristine
Project Excellence Portfolio
Kempegowda International Airport (T2)
- Karnataka
Challakere – Hiriyuru Bypass
- Karnataka
Bharamasagara – Tolahunase Railway Project
- SWR ZONE
Belgaum – Raichur Highway
- Karnataka
Hubli – Dharwad Highway Package
- Karnataka
Chitradurga – Davanagere Bypass
- Karnataka
Preparing sub grade Top activity
Location: CH 171+420 to 520 BHS
Berm cutting
Location: CH 169+240 RHS
Retaining wall Raft steel and shuttering
Location: CH 170+080 to 170+100 ( type 1) LHS
PGR level
Location: CH 171+640 in DGPS
Raft steel
Location: RUB CH 150+817 (5*5)
Slump checking
Location: CH 150+817
Slope cutting and finish activity
Location: CH 169+400
Project Progress Photographs
Preparing sub grade Top activity
Location: CH 171+420 to 520 BHS
Berm cutting
Location: CH 169+240 RHS
Retaining wall Raft steel and shuttering
Location: CH 170+080 to 170+100 ( type 1) LHS
PGR level
Location: CH 171+640 in DGPS
Raft steel
Location: RUB CH 150+817 (5*5)
Slump checking
Location: CH 150+817
Slope cutting and finish activity
Location: CH 169+400
Geotext Laying
Location: CH 171+